Program Progress
From concept to shipment — visible progress across all dimensions
MAGNE's progress spans security architecture, device engineering, network development, and commercial preparation. This page shows where the program stands across each dimension.
Progress at a Glance
Four dimensions of program development — all showing active momentum.
4
Security Certifications
8+
Certifications & Standards
1
Dual-Chain Architecture
Security & Certifications
Certification milestones define the product's security credibility and market entry readiness.
Q1–Q2 2025
CC EAL2+ Security Architecture Validation Completed
Trusted execution environment architecture validated against Common Criteria standards for process isolation.
Q2–Q3 2025
CC EAL6+ Secure Element Certification Completed
Dedicated secure element for key storage and signing operations certified at EAL6+ level — hardware wallet grade.
Q3–Q4 2025
CB / UN38.3 / CP65 Testing Completed
International battery safety, transport testing, and environmental disclosure compliance completed for global shipping readiness.
Q4 2025
Google GMS / Widevine L1 / GSMA TAC Completed
Platform compatibility and content protection certifications obtained — enabling full Android ecosystem and premium content access.
Q1 2026
FCC / CE Certification In Progress
FCC certification public filing complete. CE marking in progress for EU market entry ahead of first batch shipments.
Phone Gen1 — Security & Certifications
Hardware security and certification milestones defining MAGNE Phone Gen1's market entry readiness.
🔐 Security Architecture
CC EAL2+ TEE — Trusted Execution Environment
Done
CC EAL6+ Secure Element — HYPERSEED N60
Done
CC EAL6+ Secure Element — HYPERSEED 72B
Done
NFC Encrypted Recovery Tag
Done
Hardware Key Generation in Secure Boundary
Done
📜 Certifications & Standards
Google GMS — Mobile Services Certification
Done
Widevine L1 — DRM / Content Protection
Done
GSMA TAC — Device Identity Registration
Done
FCC Certification — US Market Entry
Done
CB Certification — International Compliance
Done
UN38.3 — Battery Transport Safety
Done
CP65 — California Prop 65 Disclosure
Done
CE Marking — EU Market Entry
In Progress
Device Program — EVT / PVT / MP Readiness
Hardware development phases from early prototype to mass production ramp.
📱 Hardware Phases
Pre-EVT — Design & Architecture Validation
Done
EVT P1 — Engineering Validation Phase 1
Done
PVT P2 — Production Validation Phase 2
Active
First Batch Manufacturing
Q3 2026 Target
Mass Production Ramp
H2 2026
🏭 Production & Delivery
Design Freeze
Done
Component Sourcing
Done
Manufacturing Partner Alignment
Done
First Batch Shipment
Jul–Sep 2026
Distribution & Fulfillment
In Planning
MAGNE Network — L1 / L2 / Developer Docs
Blockchain infrastructure, testnet progress, and ecosystem development supporting the network side of the stack.
⛓️ Chain Infrastructure
MAGNE L1 Testnet
Public Reference
MHash L2 Testnet
Testnet Phase
Chain ID Assignment
Done
L1 / L2 Explorer Visibility
Available
Wallet Integration
Done
Bridge Protocol
In Progress
🛠️ Developer Ecosystem
Developer Documentation
Available
SDK Design
In Progress
GitHub Public Repositories
Public Reference
Security Audit & Protocol Review
Planned
Validator Network
Subject to Network Phase
Capital Markets / Listing Readiness
Institutional and exchange-facing preparations supporting token and listing milestones.
⚖️ Legal & Compliance
Legal Opinion — Token Framework
Done
DD Package — Exchange Submission
Done
Token Disclosure & Transparency Reporting
Active
Smart Contract Audit
Done
🏦 Market Readiness
Market Maker Coordination
In Preparation
TGE Readiness
Subject to Conditions
Exchange Listing Submissions
Multiple Submissions
Ongoing Compliance & Reporting
Continuous
MAGNE.AI™ is a trademark of Magical Hash Global Tech Limited, currently in registration process
(USPTO Serial: 99311528 ).
© 2026 MAGNE.AI. All rights reserved.